MMAGC

Fordham University

Radio Tower

This project is the installation of Structural Steel and Concrete on top of an existing 28-story Residential Tower to create the necessary structure to support a 250-foot radio tower. This work includes multiple "picks" with a massive street crane to get the materials to the roof and close coordination with the city to minimize the effect on the neighborhood.

 









 

MMA, Inc. General Contracting and Construction Management
73 Third Street, New Rochelle, NY 10801 Tel: 914 633-1655 Fax: 914 633-3915 info@mmagc.com
©MMAGC 2004